Paranapanema HPP

TECHNICAL DATA

Client: Enel

Status: Delivered in 2022

Location: Piraju - São Paulo

Power: 31.5 MW

9.5 thousand m³ of concrete

370 tons of CA 50 Steel

2 thousand m³ of rock excavated

240 tons of hydromechanical equipment